On site now
Air leakage was tested twice before drywall: once in-house and once by a third party. Rooftop solar is being coordinated with the electrical contractor and BC Hydro.
The approach
Triple glazing, heat recovery ventilation and solar, planned at design stage rather than added later.
The image above is an architectural rendering. Site photography will be added as the build progresses.